TRAFFIC ADVISORY: Planned Lane Closures on I-59 SB, in St. Clair County

Published 1:27 pm Friday, July 12, 2019

St. Clair County – Beginning at 8 a.m., Monday, July 15, weather permitting, the Alabama Department of Transportation (ALDOT) will close either the right or left lane of I-59 southbound at various locations for Grassing Operations between the Ashville exit (Milepost 166) and the St Clair Springs exit (Milepost 156).

All travel lanes are expected to re-open at approximately 7 p.m. on Monday.

These same lane closures will be in place from 8 a.m. until 7 p.m., Tuesday, July 16th, thru Saturday, July 20.

Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area.

ALDOT thanks motorists for their patience during this construction operation to improve Alabama’s roadways. For further information, visit www.dot.state.al.us.